ACIS Shift B8 Friday 8:20 pm EST on Earth. Having commandeered HRC time, we were able to run the INT_CAL earlier than expected on Paul's watch; the last science run of the INT_CAL: SR3, I-array, Graded was started on GMT 211:12:57 and ended 211:15:18. Focal plane temperature was -118.9 C. OBSID 62773. FMT4 ~211:15:45 at 211:18:05 We turned off both Pressure Transducers A&B per script I_1_XDCR_AB_OFF rev. 3.1. Verified that they went off. ATS to power down ACIS for rad. belt passage at 212:16:58 approved. Discussion w/ Mission planning folk, Flt. Director & TST on slot "conflicts" with ACIS commanding and other activities. We tried to make clear to them that ACIS usually only uses solts during commanding and not during the entire collection time. This can be stressed to the Mission planning, Flt. Director & TST on A shift, if similar concerns arise. Andy delivered the scripts and procedures to be used in the next 24hrs. FYI: At 10 am EST on Saturday, power is scheduled to be interupted for about 3 hrs on "non-critical" parts of Draper building. In theory, 7th floor TST area should be fine throughout. ACIS team