File $Source: /home/juda/www/hrc_flight/contingency/RCS/ceab_rdnt.html,v $
Version $Revision: 1.2 $
Last Update $Date: 1999/03/03 21:55:50 $
HRC CCB Status Approved

OP03 Procedures op03:

HRC Contingency Procedures

Reconfigure to HRC S/C Redundant bus and HRC B side

Description:

This procedure reconfigures the HRC to use the HRC redundant power bus to run the electronic systems and to select the use of the B side central electronics assembly (CEA B).

Note: both the prime and redundant bus power are switched off prior to the change in configuration as required by CARD item HRC-C-011.

Procedure Trigger:

This procedure shall be executed by the Flight Operations Team at the request of the Science Operations Team; there are no automatic triggers.

Procedure


$Log: ceab_rdnt.html,v $

Revision 1.2 1999/03/03 21:55:50 juda

changed links for files with name changes

Revision 1.1 1998/11/04 13:59:59 juda

Initial revision


Dr. Michael Juda
Harvard-Smithsonian Center for Astrophysics
60 Garden Street, Mail Stop 70
Cambridge, MA 02138, USA
Ph.: (617) 495-7062
Fax: (617) 495-7356
E-mail: mjuda@cfa.harvard.edu