File $Source: /home/juda/www/hrc_flight/contingency/RCS/power-off.html,v $
Version $Revision: 1.2 $
Last Update $Date: 1999/03/03 21:57:56 $
HRC CCB Status Approved

OP03 Procedures op03:

HRC Contingency Procedures

Power down 5 volt bus

Description:

This procedure powers down the HRC. This may be necessary should the temperature of the HRC electronics go above the high "red" limit.

Procedure Trigger:

The Flight Operations Team shall execute this procedure if any of the HRC temperatures, given by the following temperature mnemonics, exceed their high "red" limits for more than 5 minutes.

This procedure shall also be executed by the Flight Operations Team at any time at the request of the Science Operations Team.

Procedure


$Log: power-off.html,v $

Revision 1.2 1999/03/03 21:57:56 juda

approved

Revision 1.1 1998/11/04 13:59:59 juda

Initial revision


Dr. Michael Juda
Harvard-Smithsonian Center for Astrophysics
60 Garden Street, Mail Stop 70
Cambridge, MA 02138, USA
Ph.: (617) 495-7062
Fax: (617) 495-7356
E-mail: mjuda@cfa.harvard.edu