File | $Source: /home/juda/www/hrc_flight/RCS/s_mcp_hv_up.html,v $ |
Version | $Revision: 1.7 $ |
Last Update | $Date: 1999/05/10 18:08:08 $ |
HRC CCB Status | Approved |
OP03 Procedures | op03: |
This sequence must not be used unless the pressure at the HRC detector housing is less than 10-5 torr. Also, the HRC detector housing door must be open before this sequence is executed.
Delta-Time | Command Mnemonic | Description | Cmd Field Mnemonic | Data Parameter | Telemetry Verifier | Expected Value | Notes |
---|---|---|---|---|---|---|---|
00:00:01.000 | 2SPCLDS | Spectroscopy HVPS current limit disable | 2SPCLST | DISA | sd0400 | ||
00:00:01.000 | 2SPTBHV | Set spectroscopy bottom MCP HV step to 54 | 2SPTBHV2 | 54 | 2SPBPAST | 54 | sd0336 |
00:00:01.000 | 2SPTTHV | Set spectroscopy top MCP HV step to 43 | 2SPTTHV2 | 43 | 2SPTPAST | 43 | sd022b |
00:00:02.000 | 2SPCLEN | Spectroscopy HVPS current limit enable | 2SPCLST | ENAB | sd0401 | ||
00:00:30.000 | 2SPCLDS | Spectroscopy HVPS current limit disable | 2SPCLST | DISA | sd0400
30 second delay for HV to settle |
||
00:00:01.000 | 2SPTBHV | Set spectroscopy bottom MCP HV step to 64 | 2SPTBHV2 | 64 | 2SPBPAST | 64 | sd0340 |
00:00:01.000 | 2SPTTHV | Set spectroscopy top MCP HV step to 53 | 2SPTTHV2 | 53 | 2SPTPAST | 53 | sd0235 |
00:00:02.000 | 2SPCLEN | Spectroscopy HVPS current limit enable | 2SPCLST | ENAB | sd0401 | ||
00:00:30.000 | 2SPCLDS | Spectroscopy HVPS current limit disable | 2SPCLST | DISA | sd0400
30 second delay for HV to settle |
||
00:00:01.000 | 2SPTBHV | Set spectroscopy bottom MCP HV step to 74 | 2SPTBHV2 | 74 | 2SPBPAST | 74 | sd034a |
00:00:01.000 | 2SPTTHV | Set spectroscopy top MCP HV step to 63 | 2SPTTHV2 | 63 | 2SPTPAST | 63 | sd023f |
00:00:02.000 | 2SPCLEN | Spectroscopy HVPS current limit enable | 2SPCLST | ENAB | sd0401 | ||
00:00:30.000 | 2SPCLDS | Spectroscopy HVPS current limit disable | 2SPCLST | DISA | sd0400
30 second delay for HV to settle |
||
00:00:01.000 | 2SPTBHV | Set spectroscopy bottom MCP HV step to 84 | 2SPTBHV2 | 84 | 2SPBPAST | 84 | sd0354 |
00:00:01.000 | 2SPTTHV | Set spectroscopy top MCP HV step to 73 | 2SPTTHV2 | 73 | 2SPTPAST | 73 | sd0249 |
00:00:02.000 | 2SPCLEN | Spectroscopy HVPS current limit enable | 2SPCLST | ENAB | sd0401 | ||
00:00:30.000 | 2SPCLDS | Spectroscopy HVPS current limit disable | 2SPCLST | DISA | sd0400
30 second delay for HV to settle |
||
00:00:01.000 | 2SPTBHV | Set spectroscopy bottom MCP HV step to 94 | 2SPTBHV2 | 94 | 2SPBPAST | 94 | sd035e |
00:00:01.000 | 2SPTTHV | Set spectroscopy top MCP HV step to 83 | 2SPTTHV2 | 83 | 2SPTPAST | 83 | sd0253 |
00:00:02.000 | 2SPCLEN | Spectroscopy HVPS current limit enable | 2SPCLST | ENAB | sd0401 | ||
00:00:30.000 | 2SPCLDS | Spectroscopy HVPS current limit disable | 2SPCLST | DISA | sd0400
30 second delay for HV to settle |
||
00:00:01.000 | 2SPTBHV | Set spectroscopy bottom MCP HV step to 102 | 2SPTBHV2 | 102 | 2SPBPAST | 102 | sd0366 |
00:00:01.000 | 2SPTTHV | Set spectroscopy top MCP HV step to 90 | 2SPTTHV2 | 90 | 2SPTPAST | 90 | sd025a |
00:00:02.000 | 2SPCLEN | Spectroscopy HVPS current limit enable | 2SPCLST | ENAB | sd0401 |
$Log: s_mcp_hv_up.html,v $
Revision 1.7 1999/05/10 18:08:08 jhc
corrected initial time delay to 1 sec
Revision 1.6 1998/06/05 18:11:04 juda
corrected delta-time steps from 30 min to 30 sec (current limit disable of the last two steps)
Revision 1.5 1998/05/18 15:57:08 juda
corrected telemetry verifier mnemonics for MCP HV Step commands (2SPTPST -> 2SPTPAST and 2SPBPST -> 2SPBPAST)
Revision 1.4 1998/05/13 18:34:53 juda
Added "File" entry to version table
Revision 1.3 1998/05/06 20:50:07 juda
Added OBC SCS #
Revision 1.2 1998/05/06 19:23:19 juda
Identified this as the "autonomous" version of the sequence
Marked as approved
Revision 1.1 1998/05/06 12:32:07 juda
Initial revision
Dr. Michael
Juda
Harvard-Smithsonian Center for Astrophysics
60 Garden Street, Mail Stop 70
Cambridge, MA 02138, USA
Ph.: (617) 495-7062
Fax: (617) 495-7356
E-mail: mjuda@cfa.harvard.edu