File $Source: /home/juda/www/hrc_flight/RCS/s_mcp_hv_on.html,v $
Version $Revision: 1.6 $
Last Update $Date: 1999/05/10 18:08:08 $
HRC CCB Status Approved

OP03 Procedures op03:

HRC Command Sequences

HRC-S MCP HV On - SCS #93

Description:

This sequence is used to turn on the HRC-S MCP HV power supply. This sequence disables the current limiter, sets the HV command levels to zero (first top then bottom), turns the HRC-S MCP HVPS on, and finally re-enables the current limiter.

Cautions/Restrictions:

This command sequence should only be used if the following conditions are met:
  1. The HRC-I MCP HVPS must be off
  2. The HRC is configured to be using the HRC-S with "Set HRC-S Unique Defaults"

Delta-Time Command Mnemonic Description Cmd Field Mnemonic Data Parameter Telemetry Verifier Expected Value Notes
00:00:01.000 2SPCLDS Spectroscopy HVPS current limit disable     2SPCLST DISA sd0400
00:00:01.000 2SPTTHV Set spectroscopy top MCP HV step to 0 2SPTTHV2 0 2SPTPAST 0 sd0200
00:00:01.000 2SPTBHV Set spectroscopy bottom MCP HV step to 0 2SPTBHV2 0 2SPBPAST 0 sd0300
00:00:01.000 2SPHVON Spectroscopy MCP HVPS On     2SPONST ON sd0101
00:00:02.000 2SPCLEN Spectroscopy HVPS current limit enable     2SPCLST ENAB sd0401


$Log: s_mcp_hv_on.html,v $

Revision 1.6 1999/05/10 18:08:08 jhc

corrected initial time delay to 1 sec

Revision 1.5 1999/03/03 20:32:49 juda

changed link for "Set HRC-S Unique Defaults" since filename has changed

Revision 1.4 1998/05/18 15:56:34 juda

corrected telemetry verifier mnemonics for MCP HV Step commands (2IMTPST -> 2IMTPAST, 2IMBPST -> 2IMBPAST, 2SPTPST -> 2SPTPAST and 2SPBPST -> 2SPBPAST)

Revision 1.3 1998/05/12 19:52:39 juda

Added SCS # (assigned by TRW)

Revision 1.2 1998/05/08 19:58:49 juda

Marked as "Approved"

Revision 1.1 1998/05/07 18:10:17 juda

Initial revision


Dr. Michael Juda
Harvard-Smithsonian Center for Astrophysics
60 Garden Street, Mail Stop 70
Cambridge, MA 02138, USA
Ph.: (617) 495-7062
Fax: (617) 495-7356
E-mail: mjuda@cfa.harvard.edu