File | $Source: /home/juda/www/hrc_flight/macros/RCS/off_to_s.html,v $ |
Version | $Revision: 1.2 $ |
Last Update | $Date: 1999/04/21 20:18:03 $ |
HRC CCB Status | Approved |
OP03 Procedures | op03: |
It is assumed that the HRC power configuration has already been configured (Power Configure HRC to use CEA A) and that the HRC Primary Bus power has been switched on. The HRC Power-up sequence is executed, followed by the sequence to switch to telemetry format 1 if necessary. Next executed is the sequence that sets the HRC-S unique defaults. The anticoincidence shield PMT HV is turned on and ramped to its operational level. Finally the HRC-S MCP HV is brought into operation if desired; the method depends on whether the HRC is at the aim-point of the HRMA and if not, whether the ramp-up should be done manually or autonomously.
The stored command sequence to turn on the HRC-S MCP HV must be in the enabled state. If it has been disabled in response to an EPHIN trigger, the radiation environment must be verified as safe before we can proceed. The stored command sequences to ramp the HRC-I MCP HV up and down must be disabled.
$Log: off_to_s.html,v $
Revision 1.2 1999/04/21 20:18:03 juda
Added logic branch for MCP HV turn on and clarified MCP HV operation in description.
Marked as Approved
Revision 1.1 1999/03/03 21:36:31 juda
Initial revision
Revision 1.2 1998/12/15 17:13:50 juda
removed procedure steps to set telemetry formats other than format 1 -- added logic branch for case with HRC at HRMA aim-point -- added HTML page names to link names in procedure list
Revision 1.1 1998/10/14 14:30:43 juda
Initial revision
Dr. Michael
Juda
Harvard-Smithsonian Center for Astrophysics
60 Garden Street, Mail Stop 70
Cambridge, MA 02138, USA
Ph.: (617) 495-7062
Fax: (617) 495-7356
E-mail: mjuda@cfa.harvard.edu